Culture, Onboarding, Training: Aligning initiatives for greater productivity
- Situational Overview: ProLogistix (PLX)
- Client: Beauty Systems Group (BSG), largest full service professional beauty products distributor in the world.
- Challenge: 200,000 square foot facility ranked last of twelve similar BSG DCs in productivity. Turnover high. Overtime costs rampant: 6-day, 7-day, 10-hour, 12-hour schedule common. Challenging labor market including a nearby Amazon DC with picker pay rates averaging $2.50 per hour higher than those at BSG. Lack of positive, engaging company culture.
Download the case study to learn how ProLogistix helped BSG improve their productivity.